ARMY TM 10-1670-281-23&P
AIR FORCE T.O. 13C5-32-2
NAVY NAVAIR 13-1-32
(k) Stow the risers to a point 18 inches from the suspension clevis (figure 2-38), using procedures in(j),
above. However, an S-fold is not made in the last slow. Trim all tie ends to 2 inches.
Figure 2-38. Suspension Line and Riser Stowage Completed.
(9) Closing the deployment bag. Closing the deployment bag requires a packer to be located on each
side of the bag to perform the following:
(a) Roll the suspension line stowage panel as tight as possible toward the bag open end.
(b) Insert the line stowage panel roll between the bag closing flaps and into the open end of the bag
(figure 2-39).
(c) Fold the bag closing flaps over the positioned line stowage panel roll and insure the running end of
the risers and the suspension clevis remain free and above the flaps.
WARNING
The bag closing ties will not be knotted until the risers and clevis have been
positioned over the center of the flap closure.
2-49