ARMY TM 10-1670-281-23&P
AIR FORCE T.O. 13C5-32-2
NAVY NAVAIR 13-1-32
Figure 2-44. Parachute Bag and Static Line Attached and Gore Folding Completed.
(4) Attaching the deployment line.
(a) Disassemble the pilot parachute suspension line connector link assembly.
(b) Insert the free connector link L-bar through the loop on one end of the 111 -inch long deployment
line and reassemble the link assembly.
(5) Stowing the canopy, suspension lines and deployment line.
(a) Remove the bag inversion made in (1)(a), above.
(b) Working from the crown to the skirt, S-fold the canopy into the bag (figure 2-45).
2-55