ARMY TM 10-1670-282-23&P
AIR FORCE T.O. 13C5-30-2
NAVY NAVAIR 13-1-33
Figure 2-35. Static Line Stow Complete.
r.
Completing the Pack.
(1)
Fold the risers diagonally across the top of the pack and temporarily secure each of the riser devises with a
pack tiedown strap on the upper end of the pack (figure 2-36).
(2)
Temporarily secure the pack tiedown straps at the lower end of the pack by tying the straps together.
(3)
Remove the Army Parachute Log Record (DA Form 10-42 or 3912) from the inspection data pocket (log
record pocket) on the left riser strap and record the pack data as prescribed in paragraph 2-4. Upon
completion of the entries, return the record to the pocket.
(4)
When a G-14 cargo parachute Is to be used on an aircraft that is not equipped with an anchor line cable and
a breakaway static line is required, perform the following:
(a)
Fold the static line riser clevis back against the static line webbing and secure the clevis to the webbing
with at least two turns of pressure-sensitive tape.
(b)
Cut a 12-inch length of nylon cord and remove the core threads. Center the cord length in the clevis
attaching loop on the static line end (figure 2-37). Make a temporary tie.
2-49
