TM 10-1670-286-20
EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III
0011 00
EXTRACTION PARACHUTE DEPLOYMENT BAG
Change 1
0011 00-2
a. Remove the deployment bag bridle loop from the deployment bag and sear ends (figure 1).
Figure 1. Deployment Bag Modification.
b. Cut two 24-inch lengths of type VIII nylon webbing (sear the cut ends).
c. Form a 4-inch roll in the center of each strap. Stitch around the roll and across the center of the
roll with size 3 nylon thread (figure 2).
Figure 2. Bridle Straps Formed.
d. Where the type VIII reinforcement webbing intersects the 1½-inch reinforcement tape (located at
the bottom end of the d-bag), measure up 5-inches and mark each side (figure 3).
Deployment Bag
Bridle Loop Strap
4-IN Roll