TM 10-1670-286-20
EXTRACTION LINE PANEL 0009 00
STOWING 140-FOOT THREE LOOP EXTRACTION LINE TO EXTRACTION LINE PANEL
0009 00-7
Figure 5. Extraction Line Stowed to Bottom Panel.
f. Place top panel back on pack table with stow loops facing up and stow loops running lengthwise with
table. Position top panel at upper end of bottom panel (figure 6).
g. Make half-twist clockwise in extraction line and route along right side and upper edge of top panel.
Secure extraction line to top panel with previously installed ¼-inch wide type I cotton webbing at 1st, 6th and
12th stow loops (right row). Secure ties with surgeons knot and locking knot. Make first stow in upper left
corner of the top panel. Secure with previously installed rubber retainer band.
h. Working from left to right, stow and secure remaining extraction line until approximately 1 foot extends
from lower edge of top panel. Make and secure last stow to center stow loop at lower edge of upper panel.
Secure last stow with rubber retainer band (figure 7).