TM 10-1670-287-23&P
0018 00
UNIT MAINTENANCE
MC-4 RAM AIR FREE-FALL PERSONNEL PARACHUTE SYSTEM
MAIN PILOT CHUTE BRIDLE LINE OR DEPLOYMENT BAG
0018 00-1
THIS TASK COVERS:
Remove
Install
INITIAL SETUP:
Materials/Parts
Bag, Deployment (Item 7, WP 0065 00)
Bridle Assembly, Pilot Chute (Item 2, WP 0065 00)
Equipment Condition
Lay out on packing table or other suitable area.
Personnel Required
92R (10) Parachute Rigger
REMOVE
Remove main pilot chute bridle line or deployment bag as follows:
1. Loosen bridle line girth hitch enough so that pilot chute can be passed through loop in end of bridle
line.
2. Remove bridle line from loop at bottom end of pilot chute.
Pilot Chute
Bridle Line Loop
Bridle Line
Pilot Chute Loop
Girth Hitch