TM 10-1670-287-23&P
0026 00
0026 00-3/(4 Blank)
b. Remove connector links and control lines from line organizing card and loosely connect
connector links and control lines to proper riser.
c. Using 7/16-inch open-end wrench, tighten barrel nut on connector links ¼ turn past hand tight.
d. Hand tack each riser at connector link with one turn double tape lacing and tying below the
connector link with an overhand knot.
3. Perform follow-up procedures IAW WP 0005 00.
END OF WORK PACKAGE
Connector Link
Tacking
Riser