TM 10-1670-293-23&P
0009 00
UNIT MAINTENANCE
T-10C/T-10D TROOP BACK PARACHUTE ASSEMBLY
INSPECTION
THIS TASK COVERS:
Routine
Pack-In-Process
Technical/Rigger-Type
In-Storage
Equipment Disposition
INITIAL SETUP:
Equipment Condition
Packed.
Personnel Required
92R(10) Parachute Rigger
References
WP 0008 00 and WP 0009 00
DA PAM 738-751
DA PAM 738-750
AR 750-1
TB 43-0002-4
ROUTINE INSPECTION
A routine inspection is a visual check performed to ascertain the serviceability of all visible components of
a parachute that is packed or rigged for use. The inspection will be made on all components that can be
inspected without opening the parachute pack. Prior to issue, a parachute rigger will administer this
inspection. Personnel parachutes issued for an air delivery operation and not deployed will receive a
routine inspection prior to being placed into ready-for-issue storage.
PACK-IN-PROCESS INSPECTION
A pack-in-process inspection is performed at specified intervals during the packing of a parachute to
ensure that only authorized procedures and methods are being used. A parachute rigger other than the
packer or rigger preparing the applicable equipment for use will accomplish the inspection. The intervals,
at which the inspection is performed, are as follows:
WARNING
Deployment bag will be given a complete inspection, including static
line and that portion of the static line that is covered by the static line
sleeve. Failure to do so could result in serious injury or death to the
parachutist.
NOTE
For Army personnel, the In-Process-Inspector (IP) qualifications are
IAW AR 750-32.
0009 00-1
Change 1