TM 10-1670-293-23&P
0011 00
0011 00-3
Change 1
c. Secure the static line to the deployment bag.
2. Attaching the snap hook to the USL, or the USL extension.
a. Position the snap hook so the opening is facing outward. Lay the static line flat on the packing
table; ensure the green ID marking thread is on top and on the outside of the loop.
b. Pass the 3½-inch loop end of the static line through the opening in the base of the snap hook,
from bottom to top.