TM 10-1670-305-23&P
0010 00-15/16 Blank
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453
0010 00
OPERATION UNDER USUAL CONDITIONS
SHUT DOWN AFTER TESTING
1. Verify that altitude chamber is at ground level. If required, press DUMP switch (15).
2. Open altitude chamber lid and remove AR2 from altitude chamber.
3. Cocking support shall remain inside the altitude chamber. Close altitude chamber lid.
4. Switch test chamber ON/OFF switch (21) to OFF.
5. Prepare AR2 for storage or shipment (WP 0023 00).
PREPARATION FOR MOVEMENT
1. If necessary, open altitude chamber lid and remove AR2.
2. Prepare AR2 for storage or shipment (refer to WP 0023 00).
3. Disconnect control assembly power cable from 110 VAC outlet. Coil power cable behind
vacuum pump/air compressor.
WARNING
The test chamber and carrying case weighs 60 lbs. The test chamber weighs 42
lbs. Use two persons or lifting device when moving or lifting to prevent injury to
personnel.
4. Install test chamber in carrying case. Close and lock carrying case lid.
