• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Stowing the suspension lines and suspension risers - TM-10-1670-280-23P_192
Lacing the deployment bag.

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  164    165    166    167    168  169  170    171    172    173    174  
TM 10-1670-280-23&P                                                       0013 00 0013 00-37 i. Secure the stow tie with a surgeon’s knot and locking knot. j. Using the procedures in (a) through (i), stow the remaining length of suspension lines and the suspension risers to a point 6 to 10-inches from the clevis attaching loops on the end of the suspension risers.    k.     Install an additional stow tie on the center strap loop in order to route the suspension risers from the center of the bag.    l. Trim all ties to 2-inches.    m.   Remove excess ties.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.