• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Deployment Bag Panels, Flaps and Cover
Deployment Bag Locking Stow Loops

TM-10-1670-281-23P Parachute Cargo Type: 64-Foot Diameter Model G-12D NSN 1670-00-893-2371 and Model G-12E NSN 1670-01-060-3705 Manual
Page Navigation
  195    196    197    198    199  200  201    202    203    204    205  
ARMY TM 10-1670-281-23&P AIR FORCE T.O. 13C5-32-2 NAVY NAVAIR 13-1-32 2-42.  Deployment Bag Panels, Flaps and Cover (cont). 5   Using   nylon   cloth,   mark   and   cut   a   patch   2   1/2   inches   wider   and   longer   than   inside measurements  of  the  prepared  hole.  Ensure  that  patch  material  is  marked  and  cut  along  the warp or filling of fabric. 6   Center patch material over prepared hole. Pin patch material in position. 7   Make a 1/2-inch fold under on each edge of patch material and baste patch to prepared area. Basting will be performed using procedures in paragraph 2-19a. 8   Remove  pushpins  securing  the  item  to  repair  table  and  secure  the  patch  of  the  nylon  bag, using a medium-duty sewing machine and size E nylon thread. Stitching will be 7 to 11 stitches per inch (figure 2-132). Figure 2-132 .   Patching Deployment Bag Panels, Flaps and Cover .   (b) Suspension line stowage flap and bag closing flaps. There is no limit to the size or number of patches that may be applied to the suspension line stowage flap and bag closing flaps. Patch material will be of type III 7.25-ounce nylon duck cloth. Use the patching procedure in (a), above. (c) Bag cover. There is no limit to the size or number of patches that may be applied to the bag body. Patch material will be type III 7.25-ounce nylon duck cloth. Use the patching procedure in (a), above. 2-178







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.