• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 31. Making First S-fold.
Figure 35. Forming a Bridge Over Top of Ejector Spring.

TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Page Navigation
  170    171    172    173    174  175  176    177    178    179    180  
TM 10-1670-327-23&P
0016 00
4. Make two small intermediate S-folds (figure 33, item 1) on the left side approximately 4 inches wide.
1
Figure 33. Making Two Intermediate S-folds.
5. Place the compressed ejector spring (figure 34, item 1) in the center of the folded canopy (figure 34,
item 2) with the ejector spring rod (figure 34, item 3) exiting the container from the upper right.
1
2
3
Figure 34. Placing Compressed Ejector Spring on Folded Canopy.
0016 00-25






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.