MWO 10-1670-296-20-1
ROUTINE
MWO effective date is 15 May 1995 and completion date 18 August 1996
MODIFICATION WORK ORDER
MODIFICATION OF THE RELEASE, CARGO, PARACHUTE, M-1
NATIONAL STOCK NUMBER (NSN) 1670-01-097-8816
HEADQUARTERS, DEPARTMENT OF THE ARMY
WASHINGTON, D.C.
15 MAY 1995
REPORTING ERRORS AND RECOMMENDING IMPROVEMENTS
You can help improve this manual. If you find any mistakes, or if you know of a way to improve these procedures,
please let us know. Mail your letter or DA Form 2028 (Recommended Changes to Publications and Blank Forms), or DA
Form 2028-2 located in the back of this manual directly to: Commander, US Army Aviation and Troop Command, ATTN:
AMSAT-I-MP, 4300 Goodfellow Blvd., St Louis, MO 63120-1798.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
1.
PURPOSE. The purpose of this modification is to upgrade the retainer damp and toggle lock slide of the M-1
Cargo Parachute Release.
2.
PRIORITY. This modification is classified "ROUTINE'.
a. Equipment In Use: Equipment in use will be modified and completed no later than the scheduled completion
date. Equipment not modified after the expiration of the Modification Work Order (MWO) completion date will be
reported as Not Mission Capable (NMC), in accordance with applicable Army regulations.
b. Equipment In Wholesale Depot Supply or Maintenance Activities The MWO will be accomplished on
serviceable material prior to issue and/or subsequent to the scheduled completion date. Issue of material not modified is
prohibited. The MWO will be applied to unserviceable material during scheduled Depot Maintenance.
3.
END ITEM OR SYSTEM TO BE MODIFIED. The following end items shall be modified in accordance with the
Nomenclature
NSN
Serial Number
Release, Cargo, Parachute, M-1
1670-01-097-8816
Not Applicable
4.
MODULES (Components, Assemblies, Subassemblies, Boards, and Cards) TO BE MODIRED.
Not applicable.
5.
PARTS TO BE MODIFIED. Not applicable
6.
APPLICATION.
a. Time Compliance Schedule: The MWO time compliance period begins on 15 May 1995. The completion date
is 18 August 1996.
b. Level of Maintenance: Unit Maintenance.
c. Applied By: Unit Maintenance.
d. Time Required: (Time for completion of MWO application to one end item.)
WORK FORCE/SKILLS
MAN-HOURS
1 Parachute Rigger (MOS 43E)
0.5
e. MWO to be applied to or concurrently with this MWO: None.
1