TM 10-1670-265-12&P
T.O. 13C7-1-12
4-21. G-12E -SERVICE (Cont)
4-21
PACKING (Cont.)
12. Stowing the suspension lines, center line, and risers.
a. Preparation for locking stows.
(1) Rigger number 1 positions the suspension lines.
(2) Riggers number 2 and 3 pull out and position the locking stow flat.
GO TO NEXT PAGE
4-70