TM 10-1670-265-12&P
T.O. 13C7-1-12
INDEX
Subject
Paragraph
Subject
Paragraph
Checks and services, maintenance,
A
preventive
Administrative storage
4-22
Operator
2-2
Alinement of ASPSU
4-18
Organizational
4-9
Altitude sensor parachute staging unit
Cleaning:
(ASPSU):
Center line
4-13
Description
1-8
Altitude sensor parachute staging unit
Checks and services:
(ASPSU)
4-19
Operator
2-2
Controls and indicators, operators
2-1
Organizational
4-9
Maintenance
4-16
D
Initial setup
4-15
Deployment bag for G-12E:
Testing
4-17
Alteration
4-21, 10
Alinement
4-18
Stencil
4-21, 10
Cleaning
4-19
Description, functional
1-12
Service
4-19
Destruction of materiel to prevent
Replace
4-20
enemy use
1-4
Disassembly
4-20
Destructive test of cutter module
4-17, 3
Inspection
4-20
Disassembly of ASPSU
4-20
Reassembly
4-20
Altitude setting for ASPSU
2-7
Assembly and preparation for use
2-4
E
Auxiliary equipment, operation of
2-10
Enemy use, prevent
1-4
Equipment data
T1-1
B
Equipment improvement recommenda-
tions, reporting
1-3
Barometric pressure setting
T2-3
Expendable supplies and materials list
D-1
Barometric pressure setting for ASPSU
2-7
F
C
Forms, records, and reports
1-2
Cargo parachute, G-12E, 64-foot-
TI-i
diameter:
Functional description
1-12
Description
1-8
Functional description of ASPSU
4-17
Checks and services:
Operator
2-2
Organizational
4-9
G
Maintenance
4-21
G-12E
Center line:
Initial setup
4-21
Initial setup
4-12
Service
4-21
Inspect
4-12
Packing
4-21
Service
4-13
Repair
4-14
H
Replace
4-15
HAARS placed in standby condition
2-8
Cleaning
4-13
HAARS placed in shutdown condition
2-9
Removal
4-15
Installation
4-15
I
Center line, 57-foot-long:
Improvements to manual, recommen-
Description
1-8
ding (See table of contents)
Checks and services:
Initial setup
Operator
2-2
Center line
Organizational
4-9
Inspection
4-12
Maintenance
4-12
Index 1