TM 10-1670-268-20&P 0003 00
0003 00-2
Unpacking. Position all components as near as practical to the location where the platform is to be
assembled. Removed and discard packing from the components.
Checking Unpacked Equipment. When type V or dual row components are received from a designed
supply source, parts shall be given an inspection (WP 0006 00) by the using unit prior to being placed
into service.
1. Inspect the type V and dual row platform components for damage incurred during shipment. Report
the damage on a DD Form 6, Packing improvement Report. Remove all assembly components from
the containers and ensure that all items are accounted for and free of defects. Report damage or
defects in accordance with DA PAM 738-750.
2. After the inspection is completed, the platform components can be stored or assembled for airdrop
operations.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment
(MTOE) and the Table of Distribution and Allowances (TDA) applicable to your unit. The common hand
tools required for assembly and repair of the type V and dual row platform are listed in WP 0020 00 of this
manual.
SPECIAL TOOLS AND EQUIPMENT
No special tools or equipment are needed by organizational maintenance personnel to maintain the type
V or dual row airdrop platform. Common tools are listed in WP 0020 00, table 2., of this manual.
REPAIR PARTS
Repair parts are listed in WPs 0021 00 through 0032 00 of this manual.
END OF WORK PACKAGE
