TM 10-1670-269-23&P
0013 00
0013 00-29
8. Attach hooks of the pack opening spring bands to corresponding hook eyes on the pack tray. Begin
with ripcord end and continue counterclockwise until all pack opening spring bands are attached.
Make certain that bands are not twisted. Bands at ripcord location should not be over ripcord handle.
9. Perform a rigger check (9th).
10. After receiving the 9th rigger check, remove pull-up cords by routing one end of cord under locking
pin and slowly withdraw pull-up cord.
Pull-up Cord Properly
Routed
Packing Opening
Spring Bands
Hook Eye
Ripcord
Protector Flap
Pull-Up Cords
Removed for
Clarity
Ripcord Pin