ARMY TM 10-1670-271-23&P
AIR FORCE TO 14D1-2-464-2
MARINE CORPS TM 01136B-23&P/1
2-16. PACKING THE T-10B PARACHUTE (CONT).
i. Tying Breakcord. Before stowing the canopy in the deployment bag, the canopy must be attached at
the bridle loop to the static line loop. Proceed as follows:
Warning
Inspect deployment bag and entire static line including that portion under
sleeve.
(1) To secure the static line while stowing the canopy, S-fold the static line and roll the suspension line
protector flap around the folded line. Secure ends of the protector flap with rubber retainer bands (see detail A,
figure 2-37).
(2) Double 36-inch length of Type 1, 1/4-inch cotton webbing, and pass one end of doubled webbing
through the loop in the end of the static line, through bridle loop of the canopy, and back through loop In the
end of the static line.
NOTE
Packing paddle may be used to aid In tying the breakcord tie. Remove the
packing paddle after completing the tie.
Figure 2-37. Deployment Bag Prepared for Stowing of Canopy.
Change 2
2-50