TM 10-1670-272-23&P 0011 00
0011 00-39
15. Continue alternating the stows from right to left until approximately 8- to 10-inches of suspension lines
are left unstowed.
16. Rigger check number 5.
NOTE
There should be a minimum of 8 stows on each panel.
17. Remove the connector links from the tension plate.
18. Fold the excess slack from the remaining suspension lines over the stowed suspension lines.
TYING CONNECTOR LINKS AND SUSPENSION LINE PROTECTIVE COVER
To secure the packed deployment bag, continue as follows:
1. Unroll suspension line protector cover and cover suspension lines.
NOTE
Ensure that the risers are still in proper layout.