TM 10-1670-272-23&P 0011 00
0011 00-19
9. Starting with line 1, fold the left group of gores until you reach line No. 6. Pick up the control line and
put it between suspension line No. 5 and No. 6. Continue folding the gores until you reach suspension
line No.14. Pick up top anti-inversion net approximately 6- to 8-inches from suspension line No. 15.
Raise it as you insert your elbow inside the anti-inversion net, placing suspension line No.15 over your
left shoulder. Drape the last gore on the left and the next to last gore on the right.
10. Insert the two groups of lines into a line separator, with the left group of lines in the left slot and the
right group of lines in the right slot.