ARMY TM 10-1670-275-23&P
AIR FORCE TO 13C5-25-2
NAVY NAVAIR 13-1-26
2-16. Packing 12-Foot Cargo Parachute.
This task covers:
a. Inspection
i. Assembly
b. Orientation
j Folding the Gores
c. Preparing Parachute for Proper
k. Longfolding the Canopy
Layout
I. Stowing the Canopy
d. Removing Inversion
m. Stowing Suspension Lines
e. Removing Turns
n Riser Securing Ties
f. Removing Tangles
o. Completing Pack
g. Removing Twists
h. Proper Layout
Tools:
Personnel Required:
Packing Weights, Item 1, Section III,
43E(10) Parachute Rigger
Appendix B
Line Separator, Item 2, Section III,
Equipment Condition:
Appendix B
Parachute cleaned (reference paragraph 2-12)
Materials/Parts:
and given a shakeout (reference paragraph 2-11).
Cord, Nylon, Type III, Item 11,
References:
Appendix D
Retainer Band, Rubber, Item 1,
TM 10-1670-201-23 T.O. 13C-1-41/
Appendix D
NAVAIR 13-1-17
Tape, Pressure Sensitive, Item 26,
TB 750-126
Appendix D
TB 43-0002-4
Thread, Cotton, Ticket No. 8/7, Item 28,
Appendix D
Webbing, Nylon, Tubular, 3/4-In. OD,
Item 40, Appendix D
Webbing, Cotton, Type 1, 1/4-in., Item 36,
Appendix D
WARNING
Failure to detect areas of damage may result in malfunction of the parachute
and injury or loss of life to personnel.
2-22