ARMY TM 10-1670-276-23&P
AIR FORCE T.O. 13C5-29-2
NAVY NAVAIR 13-1-29
Figure 2-47. Gore Section 3, Replacement Details.
(f) On each side of replacement gore section material, make a 3/4-inch wide foldunder and aline folded edge with
outside edge of each original gore section radial tapes. Temporarily secure each of side foldunders with pushpins.
(g) At upper end of replacement gore section, make a doubled 3/4-inch wide foldunder and aline upper edge of fold with
upper edge of vent reinforcement tape (upper lateral band). Temporarily secure foldunder pushpins.
(h) Baste edges of replacement gore section in accordance with paragraph 2-17a and remove pushpins.
(i) Using a light duty sewing machine and size E nylon thread, secure replacement gore section to original gore section
radial tapes, vertical tape and vent reinforcement tape (upper lateral band) with two rows of stitching, using 7 to 11
stitches per inch.
(j) Remove basting, reinvert canopy to outside, and remove original gore section material by cutting up inside of each
applicable radial tape, up both sides of vertical tape, and across lower edge of vent reinforcement tape (upper lateral
band).
2-73