TM 10-1670-277-23&P 0016 00
0016 00-2
4. Pass one webbing end through vent lines and join webbing ends together above vent lines with a 5-inch
long overlap. Ensure the webbing length encircles all vent lines.
5. Secure overlapped webbing ends together by stitching a 5-inch long, three-point WW-stitch formation,
with a 1/8-inch overstitch on each webbing end. Stitching will be 5 to 8 stitches per inch.
6. Remove original attachment loop (bridle loop) by cutting loop webbing as required.
END OF WORK PACKAGE
Side View
Top View