TM 10-1670-277-23&P 0003 00
0003 00-6
c. Modified By. Enter the last name of the individual who has performed the modification. If the original
log record for the parachute has been lost, and it has been ascertained through inspection that a
particular modification has been accomplished, the entry for this column will be C/W, COMPLIED
WITH (Item 2, Illustration below), which signifies the applicable MWO has been complied with.
d. Inspected By. The individual who accomplished the inspection required after modification will sign
this entry with their last name only.
e. Unit. Enter the unit designation responsible for performing the MWO or in the event of a lost Log
Record, the unit to which the inspector is assigned.
f.
Date. Enter the date (day, month, and year) the modification work was completed.
4. Unit and Direct Support Repair and Inspection Data. When a parachute canopy assembly is initially
received from a supply source and a technical/rigger-type inspection is performed, the inspection
accomplishment will be documented on the Unit and Intermediate Repair and Inspection Data page of
the individual Parachute Log Record. Additional entries will also be made on this page each time the
canopy assembly is repaired or is administered an inspection in compliance with a Maintenance Advisory
Message (MAM) or Ground Precautionary Message (GPM). The page completion criteria is as follows:
a. Type of Repair. Enter the type of repair, completion of initial inspection, repair accomplishment, or
MAM or GPM compliance.
b. Inspection By. The individual who accomplished the inspection required will sign this entry with last
name.
c. Unit. Enter the unit designation responsible for performing the type of repair.
d. Date. Enter the date (day, month and year) the repair was performed.