TM 10-1670-277-23&P 0003 00
0003 00-9/(10 Blank)
d. If it can be ascertained by inspection that a previous Modification Work Order (MWO) has been
complied with, applicable entries will be made on the appropriate page of the replacement log record.
e. Attach the replacement log record to the log record/inspection data pocket using the procedures
detailed above.
RECEIPT OF USED PARACHUTE
Upon initial receipt of used parachute proceed as follows:
1. Follow procedures given in the GENERAL PROCEDURES FOR AIR DELIVERY paragraph above, and
check each component for excessive wear and tear.
2. If defects or damages are discovered, process the parachute for maintenance at the maintenance level
assigned by the MAC (WPs 0056 00 and 0057 00).
AFTER-USE RECEIPT
When a parachute is received at the maintenance activity following its use during airdrop, it must be given a
shakeout and aired (WP 0007 00), and, if necessary, cleaned (WP 0008 00) before it can be returned to
service. If a parachute is issued but not used, it does not need to be given a shakeout; however, it must be
aired if it has been subjected to conditions of dampness.
CHECKING UNPACKED EQUIPMENT AFTER SHIPMENT
1. Inspect equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage on a SF 361, Transportation Discrepancy Report (TDR).
2. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies
in accordance with the instructions in DA PAM 738-750.
3. Check to see whether the equipment has been modified.
END OF WORK PACKAGE
