ARMY TM 10-1670-278-23&P
AIR FORCE T.O. 13C5-26-2
NAVY NAVAIR 13-1-27
2-4.
lnitial Receipt (cont).
(c)
Modified by. Enter the last name of the lndividual who has performed the modificatlon. If
the original log record for the parachute has been lost, and it has been ascertained through inspection
that a particular modification has been accomplished, the entry for this column will be C/W "Complied
With" (2, figure 2-4), which signifies the applicable MWO has been complied with.
(d)
lnspected by. The individual who accomplished the inspection required after
modification will sign this entry with his last name only.
(e)
Unit. Enter the unit designation responsible for performing the MWO or In the event of a
lost Log Record, the unit to which the Inspector is assigned.
(f)
Date. Enter the day, month, and year the modification work was completed.
(4)
Unit and intermediate repair and inspection data.
When a parachute assembly is initially
received from a supply source and a technical/rigger-type inspection is performed, the inspection
accomplishment will be documented on the Unit and Intermediate Repair and Inspection Data
page of the individual Parachute Log Record (figure 2-5). Additional entries will also be made
on this page each time the assembly is repaired or is administered an inspection in compliance
with a one-time inspection Technical Bulletin (TB). The page completion criteria is as follows:
(a)
Type of repair. Enter the type of repair, completion of initial inspection, repalr
accomplishment, Technical Bulletin inspection compliance.
(b)
lnspection by. The individual who accomplished the inspection required will sign this
entry with last name.
(c)
Unit. Enter the unit designation responsible for performing the type of repair.
(d)
Date. Enter the day, month and year the repair was performed.
2-6
1.
2.
3.
COMPLETlON OF INITIAL INSPECTION.
REPAIR ACCOMPLISHMENT.
TECHNlCAL BULLETIN INSPECTION
COMPLIANCE
Figure 2-5. Log Record Entries for Unit and Intermediate Repair and inspection Data Page.