ARMY TM 10-1670-278-23&P
AIR FORCE T.O. 13C5-26-2
NAVY NAVAIR 13-1-27
2-16. Packing the 15-Foot Cargo Extraction Parachute.
This task covers:
a
Inspection
h.
Folding the Gores
b.
Orientation
i.
Longfolding the Canopy
c. Preparing Parachute for Proper
J. Stowing the Canopy
Layout
k. Stowing Suspension Lines
d.
Removing Inversion
I.
Closing the Deployment Bag
e.
Removing Partial Inversions
m. Attaching the Extraction Line
f.
Locating Suspension Lines
n.
Stowing the 60-Foot Type X Extraction
g.
Attaching and Stowing Deployment
Line
Bag Retaining Tie
o.
Signing DA Form 10-42/3912
Tools:
Personnel Required:
Packing Weights, Item 8, Appendix B
43E(10) Parachute Rigger
Line Separator, Item 4, Appendix B
Packing Paddle, Item 7, Appendix B
Equipment Condition:
Knife, Item 1, Appendix B
Parachute cleaned (reference paragraph 2-12)
Materials/Parts:
and given a shakeout (reference paragraph
2-11).
Retainer Band, Rubber, Item 1,
Appendix D
References:
Thread, Cotton, Size 817, Item 26, Appendix D
Webbing, Cotton, Type I, 1/14n.,
TM 10-1670-201-23 T.O.
13C-1-411
Item 34, Appendix D
NAVAIR 13-1-17
Tape, Pressure Sensitive, Item 24,
DA PAM 738-751
Appendix D
TB 43-0002-4
WARNING
Failure to detect areas of damage may result In malfunction of the parachute and injury or
loss of life to personnel.
2-23