ARMY TM 10-1670-278-23&P
AIR FORCE T.O. 13C5-26-2
NAVY NAVAIR 13-1-27
Figure 2-24. Attaching Bridle Loop to Deployment Bag.
(2)
Beginning at upper right inside corner of deployment bag, stow canopy in the bag with 5-fold (A, figure 2-
25). Upon completion of canopy stowage, suspension lines should extend from left side of the bag open
end (B, figure 2-25).
(3)
Stand deployment bag upright with suspension lines routed from bag left side.
(4)
Using one turn single, thread, cotton, ticket no. 8/7 route thread through top and bottom center bag, tie
loops by passing thread ends through tie loop from right to left. Fold suspension lines from left to right
over skirt of canopy and routed thread. Secure tie over the folded suspension lines with a surgeon's knot
and a locking knot. Trim tie ends to 2 inches (B, figure 2-25).
Change 1 2-39