ARMY TM 10-1670-278-23&P
AIR FORCE T.O. 13C5-26-2
NAVY NAVAIR 13-1-27
2-16. Packing the 15-Foot Cargo Extraction Parachute (cont.)
n.
Stowing the 60-Foot Type X Extraction Line.
(1)
Position packed deployment bag on a packing table with bottom facing up.
(2)
If applicable, secure V-knife, located on the extraction line 30 feet from load attaching loop t6 extraction
line webbing using pressure-sensitive tape.
(3)
Stow extraction line by S-folding along length of deployment bag, making layers of folds, as required.
Using deployment bag Tie down loops, secure each layer of S-folded extraction line at a minimum of two
points. Make each tie with a suitable length of one turn single, 1/4-inch wide, Type I Cotton webbing.
(figure 2-31).
Figure 2-31. Stowing the Extraction Line.
o.
Signing DA Form 3912.
(1)
Remove parachute log record book from parachute inspection data pocket (log record pocket) on upper
end of the deployment and record pack data as prescribed in para 24.
(2)
After completion of entries. Return log record book to inspection data pocket.
Change 2 2-46
