TM 10-1670-280-23&P 0012 00
0012 00-25
b. A third packer shall move to a point located a reasonable distance below the top of the canopy, pick
up the canopy from the packing surface and S-fold the canopy material into the deployment bag.
c. Continue stowing the canopy until only 2-feet of the canopy remains out of the deployment bag.
d. At a point immediately below the skirt reinforcement, grasp both groups of suspension lines with the
right hand, and two-feet below the right hand, grasp both groups with the left hand.
e. While holding both groups of suspension lines, pick up the canopy skirt and push the canopy skirt,
and 18-inches of suspension, lines into the deployment bag.
Bag Top
Cutter at
Suspension
Line 1
Cutter at
Suspension
Line 61
Bag Bottom