TM 10-1670-280-23&P 0013 00
0013 00-36
d. Secure the tacking ends at each tacking point with a surgeons knot and locking knot.
e. Trim tie ends to 2-inches.
17. Stowing the suspension lines and suspension risers.
a. Extend the running end of the suspension lines to the upper right corner of the deployment bag.
b. Measure to the right edge of the stowage compartment and form the first suspension line stow by
making a loop in the suspension lines.
c. Secure the first suspension line stow to the upper right outside strap loop using the first stow tie.
d. Secure the stow tie with a surgeons knot and locking knot.
e. Rigger check number 5.
f.
Extend the running end of the suspension lines across the deployment bag to the upper left corner of
the deployment bag.
g. Measuring to the left edge of the stowage compartment, form the second suspension line stow by
making a loop in the suspension lines.
h. Secure the second suspension line stow to the upper left outside strap loop using the second stow
tie.
