TM 10-1670-280-23&P 0013 00 0013 00-39 NOTE Proceed to LOG RECORD BOOK ENTRIES below for log book entries. NOTE Paragraphs (19) through (26) will be used when packing the G-11D in the nylon deployment bag. 19. Arming the reefing line cutters. a. Position the four reefing line cutters on top of the stowed canopy with the cutter at suspension line 61 placed adjacent to the arming loop on the bag bottom, the cutter at suspension line 31 placed adjacent to the arming loop on the left side of the deployment bag, the cutter at suspension line 91 placed adjacent to the arming loop on the right side of the deployment bag and the cutter at suspension line 1 placed adjacent to the arming loop on the bag top. 611
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business