TM 10-1670-280-23&P 0011 00
0011 00-13
a. At a suitable point below the canopy skirt (lower lateral band), position a large line separator between
the two groups of suspension lines. Insert line 61 into the right slot.
b. While holding line 61 in position in the line separator, pick up the right suspension line group and
throw the right group of gores and lines over the left group of gores and lines.
c. Cut four 16 ½-foot lengths of ½-inch wide tubular nylon webbing and tape 2-inches of the ends of
each webbing length with masking tape.
d. Rotate the reefing line cutter at line 61 upward and pass one end of a 16 ½-foot reefing line from left
to right through the hole in the reefing line cutter. Pull 6-inches of the reefing line through cutter.