TM 10-1670-280-23&P 0011 00
0011 00-36
b. Secure each lower outside corner of the suspension line protector flap to the deployment bag by hand
tacking using one turn single, orange cotton thread ticket No. 8/4 at each tacking point.
c. Pass the tacking needle through the deployment bag outside edge of the reinforcement strap and the
protective flap edge reinforcement.
d. Secure the tacking ends at each tacking point with a surgeons knot and locking knot.
e. Trim tie ends to 2-inches.
17. Stowing the suspension lines and suspension risers.
a. Extend the running end of the suspension lines and center line to the upper right corner of the
deployment bag.
b. Measuring to the right edge of the stowage compartment, form the first suspension line stow by
making a loop in the suspension lines.
c. Secure the first suspension line stow to the upper right outside strap loop using the first stow tie.
d. Secure the stow tie with a surgeons knot and locking knot.
e. Rigger check number 5.
f.
Extend the running end of the suspension lines across the deployment bag to the upper left corner of
the bag.
g. Measuring to the left edge of the stowage compartment, form the second suspension line stow by
making a loop in the suspension lines.
