TM 10-1670-280-23&P 0011 00 0011 00-38 18. Lacing the deployment bag. a. Bring the suspension line protector flap down over the stowed suspension lines and suspension risers. The grommets on the flap sides should overlap the grommets on the side of the deployment bag. b. Cut two 60-inch lengths of ¼-inch cotton webbing for use as lacing ties. c. Secure an end of each webbing length to the first grommet located on the bottom corner of the deployment bag upper corners with two half-hitches. d. With a packer positioned on each side of the deployment bag and using the lacing tie running end, lace the flap to the deployment bag main body, grommet over grommet. Center Strap Loop Stow TieClevis Attaching Loops Suspension Risers Suspension Lines
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business