TM 10-1670-280-23&P 0011 00
0011 00-38
18. Lacing the deployment bag.
a. Bring the suspension line protector flap down over the stowed suspension lines and suspension
risers. The grommets on the flap sides should overlap the grommets on the side of the deployment
bag.
b. Cut two 60-inch lengths of ¼-inch cotton webbing for use as lacing ties.
c. Secure an end of each webbing length to the first grommet located on the bottom corner of the
deployment bag upper corners with two half-hitches.
d. With a packer positioned on each side of the deployment bag and using the lacing tie running end,
lace the flap to the deployment bag main body, grommet over grommet.
Center Strap
Loop Stow Tie
Clevis Attaching
Loops
Suspension
Risers
Suspension Lines