TM 10-1670-287-23&P
0013 00
0013 00-10
7. Holding all of the high points together directly in line with the D line group, make an S-fold so that the
D line group is on top of the A, B, and C line groups. Ensure high points are kept taut.
8. Clear the stabilizers by pulling them to the outside. Make sure that there are no lines wrapped
around them. There are three stabilizer panels on each side.
Control
Lines
Stabilizer
Panels
A, B, C, and D
Line Groups