TM 10-1670-287-23&P
0013 00
0013 00-29
11. Route pull-up cords through upper pilot chute grommet tabs. Compress pilot chute, ensuring that
canopy fabric is clear of spring, grommets and closing loops. Canopy fabric will be distributed to left
and right sides of pilot chute. Pull closing loops up through tabs and insert temporary locking pins.
12. Route pull-up cord through grommet in bottom flap. Pull up closing loop and reinsert temporary
locking pin.
Temporary
Locking Pins
Temporary Locking Pin
Pull-Up
Cord
Bottom Flap