TM 10-1670-287-23&P
0013 00
0013 00-31
16. Ensure reserve ripcord is through ripcord housing and insert ripcord grip in ripcord pocket. Insert
reserve ripcord cable through reserve static line pull ring, then through reserve static line guide ring.
Mate static line and container hook and pile tapes.
17. Route pull-up cords through grommets in top flap, pull up closing loops, and reinsert temporary
locking pins.
18. Pull up top pull-up cord and inset top ripcord pin into closing loop.
Top Flat
Reserve Static Line
Guide Ring
Reserve
Static Line
Pull Ring
Reserve
Static Line
Reserve
Ripcord
Cable