TM 10-1670-287-23&P
0014 00
0014 00-2
PACK-IN PROCESS INSPECTION
A rigger supervisor other than the packer during the applicable packing process shall conduct the pack-in-
process inspection. This inspection is required to ensure that only authorized packing procedures are
used. The prescribed intervals to conduct the pack-in-process inspection are as follows:
1. Proper Layout
a. Main canopy release ripcord installed
b. Risers attached to harness
c. Deployment brakes set
d. Line check complete
e. Canopy flaking complete
2. Slider Up
a. Canopy s-folding complete
b. Tail folding complete
c. Slider pulled up and positioned
3. Four Locking Stows
a. Canopy stowing complete
b. Deployment bag locking stows complete
4. Suspension Lines Stowed
5. Packing Complete
a. Container closed (bottom, left, right, top)
b. All packing aids removed
c. Log record book filled out
6. Automatic Opening Device Installed
ATTACHING RISERS TO HARNESS
Attach risers to harness as follows:
1. Insert main ripcord cable through main ripcord housing. Insert main ripcord grip into ripcord grip
pocket. Insert single point release cable through cable housings. Mate hook tape on grip with pile
tape on harness. Attach reserve static line to container with reserve static line pull ring facing top of
container. Pass reserve ripcord cable through reserve static line pull ring and then through reserve
static line guide ring.
Reserve Static Line
Pull Ring
Main Canopy Release
Ripcord Housing
Main Ripcord
Release
Ripcords
Reserve
Ripcord
Ripcord Main
Release
Reserve
Static Line
