TM 10-1670-287-23&P
0014 00
0014 00-25
22. Fold center tail panel around canopy until it is the approximate width of deployment bag. Smooth out
trapped air until canopy lies flat. Keep control lines in the center.
23. Place rear riser line groups to the outside of front riser line groups. Lay slider down flat between line
groups, with reinforcement tape facing up. Ensure each line group from the canopy enters slider
grommet from the top and exits out underneath slider.
24. Grasp slider by top center, ensuring that reinforcement tape appears on the topside toward the
canopy. Bring slider up to bottom of canopy, ensuring free movement along suspension lines.
25. Rigger check number 2.
Deployment
Bag
Tail Panel
Reinforcement
Tapes
Slider