TM 10-1670-287-23&P
0014 00
0014 00-30
2. Make second suspension line locking stow in retainer band opposite first stow on the left stow.
3. Finish locking deployment bag by passing retainer bands through the two outboard grommets, then
make third and fourth suspension line locking stows.
4. Rigger check number 3.
Second Stow
Third Stow
Fourth Stow