TM 10-1670-287-23&P
0004 00
0004 00-6
4. Modification Work Order (MWO) Compliance Record Page. When a modification is performed on a
parachute canopy, make the following entries on the Modification Work Order Compliance Record
pages of the Log Record.
a. MWO number. Enter the publication number and date of the MWO that describes the MWO (1
above).
b. MWO title. Enter a short, abbreviated title extracted from the MWO prescribing the work.
c. Modified by. Enter the last name of the individual who has performed the modification. If the
original log record for the parachute has been lost, and it has been ascertained through
inspection that a particular modification has been accomplished, the entry for this column will be
Complied With (CW), (2 above), which signifies the applicable MWO has been complied with.
d. Inspected by. The individual who accomplished the inspection required after modification will
sign this entry with his last name only.
e. Unit. Enter the unit designation responsible for performing the MWO or in the event of a lost Log
Record, the unit to which the inspector is assigned.
f.
Date. Enter the day, month, and year the modification was completed.
UNIT & INTERMEDIATE
TYPE OF REPAIR
UNIT
DATE
DAY
MONTH YEAR
REPAIR & INSPECTION DATA
INSP BY
MWO 10-1670-287-20-1
AR2 CABLE MOD
AR2 CABLE MOD
02
02
1. Completion of Initial Inspection
2. Repair Accomplishment
3. MWO Inspection Compliance