TM 10-1670-292-23&P 0012 00
0012 00-12
g. Center the patch material over the prepared hole. Pin the patch material in position.
h. Make a ½-inch foldunder on each edge of the patch material and baste the patch to the prepared
area. Basting will be performed using the procedures in the BASTING AND TEMPORARY
TACKING paragraph detailed above.
i.
Remove the pushpins securing the canopy to the repair table and secure the patch by stitching
according to the details in the illustrations detailed below, and using the stitching specifics outlined
in Tables 1 and 2.
j.
Make the first row of stitching completely around the edges of the patch. Turn the canopy right-
side-out and make a second row of stitching around the edges of the prepared hole. Stitching will
be performed in accordance with the STITCHING AND RESTITCHING paragraph detailed above.
k. Reposition the canopy items removed or laid aside in step b., above, in the original location and
secure each item to the canopy by restitching according to original construction details and the
STITCHING AND RESTITCHING paragraph detailed above.
l.
If applicable, restencil informational data or gore numbers according to procedures in WP 0014
00.
![](//www.tpub.com/assessment.jpg)