TM 10-1670-292-23&P 0042 00
0042 00-4
Table 1. Maintenance Allocation Chart for the 35-Foot Diameter,
MC1-1C/MC1-1D Troop Back Parachute Assembly
(4)
MAINTENANCE LEVEL
UNIT
INTERMEDIATE
DEPOT
(1)
GROUP
NUMBER
(2)
COMPONENT/ASSEMBLY
(3)
MAINTENANCE
FUNCTION
C
O
F
H
D
(5)
TOOLS AND
EQUIPMENT
(6)
REMARKS
00
MC1-1C/MC1-1D
Parachute
Inspect
Service
Test
1.0
1.0
Table 2 in
this WP.
A, B, C,
D, E, F, G
01
Canopy
Repair
Replace
0.5
0.3
Table 2 in
this WP.
A, B, C,
E, F, G
0101
Bridle Loop
Repair
Replace
0.1
0.3
0102
Vent Line
Repair
Replace
0.1
0.5
0103
Upper Lateral Band
Repair
0.4
0104
Radial Seam
Repair
0.3
0105
Radial Tape
Replace
1.0
0106
Gore Section
Repair
Replace
0.4
1.0
F
0107
Lower Lateral Band
Repair
0.4
0108
Pocket Band
Repair
Replace
0.1
0.3
0109
V-Tab
Repair
Replace
0.1
0.3
0110
Anti-Inversion Net
Inspect
Repair
Replace
0.1
0.3
0.8
0111
Suspension Line
Repair
Replace
0.1
0.8
0112
Control Line Bridle
Repair
Replace
0.1
0.3
0113
Control Line
Repair
Replace
0.2
0.3
0114
Connector Link
Repair
Replace
0.2
0.3
02
Risers
Repair
Replace
0.3
0.2
Table 2 in
this WP.
A, C, E,
G
03
Deployment Bag
Repair
Replace
0.5
0.1
Table 2 in
this WP.
B, C, E,
G
0301
Reinforcing Webbing
Repair
0.2
0302
Locking Stow Loop
Hood
Repair
Replace
0.3
0.4
