TM 10-1670-292-23&P 0011 00
0011 00-14
(2)
Remove twists from one group at a time by rotating risers until lines are in proper location
on the connector links.
4. Check the suspension lines for proper layout. Left group should have line 1 on the top inside of the
connector link and line No. 15 on the bottom inside of the connector link. The right group will have line
No. 30 on the top inside of the connector link and line No. 16 on the bottom inside of the connector
link. Ensure the control lines are routed to the inside of the risers and are not routed around any of
the suspension lines.
5. Assemble parachute components in accordance with WP 0004 00.
6. Parachute is now in proper layout, and ready for folding the gores.
7. Rigger check number 1.