TM 10-1670-293-23&P
0026 00
UNIT MAINTENANCE
T-10C/T-10D TROOP BACK PARACHUTE ASSEMBLY
DEPLOYMENT BAG
0026 00-1
THIS TASK COVERS:
=
Repair
=
Replace
INITIAL SETUP:
Equipment Condition
Deployment bag clean with defects recorded.
Tools
Knife (Item 14, WP 0039 00)
Knife, Hot Metal (Item 15, WP 0039 00)
Pot, Melting, Electric (Item 25, WP 0039 00)
Sewing Machine, Light-Duty (Table 1, WP 0012 00)
Sewing Machine, Medium-Duty (Table 1, WP 0012 00)
Sewing Machine, Very Heavy-Duty (Table 1, WP 0012 00)
Shears (Item 29, WP 0039 00)
Personnel Required
92R(10) Parachute Rigger
Materials/ Parts
Beeswax (Item 2, WP 0053 00)
Cloth, Cotton, Sateen (Item 7, WP 0053 00)
Cord, Nylon, Type II (Item 12, 0053 00)
Thread, Nylon, Size E (Item 47/44, WP 0053 00)
Thread, Nylon, Size 3 (Item 46/47, 0053 00)
Thread, Nylon, Size 6 (Item 49, 0053 00)
Webbing, Cotton, Type II (Item 54, WP 0053 00)
Webbing, Nylon, Type VIII (Item 61, WP 0053 00)
Wire, Steel (Item 64, WP 0053 00)
References
Group No. 03, MAC (WP 0044 00)
WP 0013 00, WP 0014 00, and WP 0054 00
REPAIR
1. General. Two types of deployment bags are used with the T-10C/T-10D parachute: deployment bag
with static line attached, standard, (A) and deployment bag without static line attached, USL (B).