TM 10-1670-293-23&P
0011 00
0011 00-13
Change 1
(2) Remove twists from one group at a time, by rotating risers until lines are in proper location on
the connector links.
4. Check the suspension lines for proper layout. Left group should have line 1 on the top inside of the
connector link and line 15 on the bottom inside of the connector link. The right group will have line 30
on the top inside of the connector link.
5. Assemble parachute components in accordance with WP 0003 00.
6. Parachute is now in proper layout, and ready for folding the gores.
7. Rigger check number 1.
30