TM 10-1670-293-23&P
0011 00
Change 1
0011 00-16
3. Move to the lower lateral band of the canopy, with the right group of lines in the left hand. Lift the right
group of suspension lines, with the left hand at the anti-inversion net. Hold top center gores in
position, with the right hand, and flip the right group of gores over the left group.
4. Start with line number 16 in the right hand. Pick up line 17 with the left hand and lift straight up until
slack is removed from the lower lateral band. With a smooth continuous movement, bring the left
hand over the head. When the gore inflates, place line 17 on top of line 16. Make certain the V-tabs
are facing down and that the gore material folds to the right side.