ARMY TM 10-1670-294-23&P
AIR FORCE T.O. 13C5-33-2
NAVY NAVAIR 13-1-34
m.
Stowing the Canopy
(1)
Make the first stow of the canopy at the upper right corner of the deployment bag. Make the
second stow at the upper left corner of the deployment bag and continue to make S-fold stows
across the width of the bag until canopy is completely stowed (figure 2-22).
(2)
Turn deployment bag on end (figure 2-23).
(3)
Make one fold of suspension lines from left to right across the stowed canopy skirt.
(4)
To install a skirt hesitater pass a length of one turn 1/4-inch cotton webbing under the
suspension lines through the two Inside bag tie loops, across the top of the suspension lines,
and secure with a surgeon's knot and a locking knot (figure 2-24).
(5)
Lay bag on floor with mouth of bag toward stationary post and suspension
line stowage flap
open across top of deployment bag Insure suspension line retaining straps are facing up.
Figure 2-22. S-fold Canopy into Deployment Bag.
2-37